The Advantages

5 good reasons to chooses the CABairTEK system

Les avantagesThe CABairTEK modular system compares more than favourably to conventional construction.

Installation rapideRapid Installation
Cut down on interruption of plant operations, ensuring maintenance of productivity during installation. 

Installation rapideAdaptability
Easy to disassemble and relocate, giving you maximum flexibility.

Systeme cabairtekInstallation rapideSound-Proofing
Superior noise-reduction yielding the advantages of a more productive work environment

Installation rapideEase of Maintenance
The baked paint and satin finish requires only occasional cleaning, thereby eliminating repainting costs as well as other maintenance and repair costs.

Installation rapideDurability
Walls, floors and ceilings with reinforced cavities and a quality finish that reduces the chances of damage. A system built to last!

 

Manufacturing Process

The CABairTEK system consists of the assembly of module-based steel panels that attach to one another via a system of cams, and the joints of which are seal by compression.

Once an order has been confirmed, the file is taken in hand by the project manager. This individual has the responsibility for ensuring that production is tightly monitored at all stages, putting emphasis on respecting relevant deadlines.

Les plansSTAGE 1 : Drawings
Detailed preliminary plans are submitted speedily to the client for approval. After approval has been granted, our designers and engineers will work on the production designs. This is one of the most important stages in the process.

STAGE 2 : Cutout
With the aid of a punching machine or digital laser, the steel sections are cut out with surgical precision, respecting production designs to the letter.

STAGE 3 : Folding
Again with the aid of digital equipment, folding of the steel sections is done with extreme precision.

STAGE 4 :  Assembly
To guarantee accurate and precise assembly, two of our staff assemble the panels with the aid of templates.

STAGE 5 : Paint
In the final, but by no means the least important production stage, polyester powder paint is applied using an electrostatic procedure and baked in an oven at high temperatures so as to give both its sheen and its durability.

After packaging, we are now ready to make delivery to the client with our own transportation system and our team of installers.

 

 

Online Inquiries


Politique de confidentialité (FR) - Privacy Policy (EN) - Política de Privacidad (ES)

Recherche par mot-clés : Salle de contrôle | Bâtiment modulaire | Salle Blanche | Cabine Insonorisée | Insonorisation Industrielle | Capotage Acoustique
Keyword searching : Control room | Modular Building | Clean Room | Soundproof Cab | Industrial Noise Control | Industrial Acoustic | In-plant office | Acoustic Enclosure
Busca por palabras clave:
Insonorización Industrial | Sala Blanca | Construcciones Modulares | Oficina de planta | Sala de control
POKUS WEB SOLUTIONS - INDUSTRIAL DIRECTORY -